# Facade Engineering %% DATAVIEW_PUBLISHER: start ``` TABLE WITHOUT ID AREA, BuildingElement as Element,file.link as Issue,"☐ " + TASKS.text as Action FROM "3 Resources/Issues" FLATTEN file.tasks as TASKS FLATTEN Areas as AREA FLATTEN Disciplines as DISCIPLINE sort AREA ASC WHERE contains(DISCIPLINE,[[Facade Engineering]]) ``` %% | AREA | Element | Issue | Action | | ------------------------------------------------------- | --------------------------------------------------------------------------------------------------------------------------------------------------- | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------- | ------------------------------------------------------------------------------------------------------------------------------------------------- | | [[3 Resources/Areas/Balconies.md\|Balconies]] | <ul><li>[[3 Resources/Building Elements/External Walls.md\|External Walls]]</li></ul> | [[3 Resources/Issues/Base of Lightweight wall coverings not finished with a resilient trim.md\|Base of Lightweight wall coverings not finished with a resilient trim]] | ☐ Check that the base of cladded walls are finished with edge trims. | | [[3 Resources/Areas/Balconies.md\|Balconies]] | <ul><li>[[3 Resources/Building Elements/External Walls.md\|External Walls]]</li><li>[[3 Resources/Building Elements/Roofs.md\|Roofs]]</li></ul> | [[3 Resources/Issues/Wall and Roof Assemblies need Interstitial Condensation Modelling.md\|Wall and Roof Assemblies need Interstitial Condensation Modelling]] | ☐ The Facade Engineer shall model all external roof and wall assemblies and verify that the mould growth index is 0. | | [[3 Resources/Areas/Balconies.md\|Balconies]] | <ul><li>[[3 Resources/Building Elements/Parapets.md\|Parapets]]</li></ul> | [[3 Resources/Issues/Weatherproofing Horizontal Surfaces.md\|Weatherproofing Horizontal Surfaces]] | ☐ Architect and Facade Engineer shall check that all horizontal surfaces (excluding exposed membrane) are protected with metal flashings. | | [[3 Resources/Areas/Courtyards.md\|Courtyards]] | <ul><li>[[3 Resources/Building Elements/External Walls.md\|External Walls]]</li></ul> | [[3 Resources/Issues/Base of Lightweight wall coverings not finished with a resilient trim.md\|Base of Lightweight wall coverings not finished with a resilient trim]] | ☐ Check that the base of cladded walls are finished with edge trims. | | [[3 Resources/Areas/Courtyards.md\|Courtyards]] | <ul><li>[[3 Resources/Building Elements/External Walls.md\|External Walls]]</li><li>[[3 Resources/Building Elements/Roofs.md\|Roofs]]</li></ul> | [[3 Resources/Issues/Wall and Roof Assemblies need Interstitial Condensation Modelling.md\|Wall and Roof Assemblies need Interstitial Condensation Modelling]] | ☐ The Facade Engineer shall model all external roof and wall assemblies and verify that the mould growth index is 0. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Facade.md\|Facade]]</li></ul> | [[3 Resources/Issues/Waterproofing Undrained Cavities in Facade Systems.md\|Waterproofing Undrained Cavities in Facade Systems]] | ☐ Architect to check that there are no undrained cavities in the Façade System. | | [[3 Resources/Areas/External Areas.md\|External Areas]] | <ul><li>[[3 Resources/Building Elements/Masonry Walls.md\|Masonry Walls]]</li></ul> | [[3 Resources/Issues/Seal External Facing Masonry and Blockwork Walls.md\|Seal External Facing Masonry and Blockwork Walls]] | ☐ Architect to detail masonry sealer to external walls. | | [[3 Resources/Areas/External Areas.md\|External Areas]] | <ul><li>[[3 Resources/Building Elements/Masonry Walls.md\|Masonry Walls]]</li></ul> | [[3 Resources/Issues/Seal External Facing Masonry and Blockwork Walls.md\|Seal External Facing Masonry and Blockwork Walls]] | ☐ Project Manager shall check that details of this are included in the Owner's Manuals. | | [[3 Resources/Areas/External Areas.md\|External Areas]] | <ul><li>[[3 Resources/Building Elements/Facade.md\|Facade]]</li></ul> | [[3 Resources/Issues/Un-designed Facade Attachments.md\|Un-designed Facade Attachments]] | ☐ Architect shall brief the Façade Engineer About all elements attached to the façade of the building when obtaining a Façade Engineering Quote. | | [[3 Resources/Areas/External Areas.md\|External Areas]] | <ul><li>[[3 Resources/Building Elements/Facade.md\|Facade]]</li></ul> | [[3 Resources/Issues/Un-designed Facade Attachments.md\|Un-designed Facade Attachments]] | ☐ Façade Engineer shall document the method of fixing for all Façade Elements. | | [[3 Resources/Areas/External Areas.md\|External Areas]] | <ul><li>[[3 Resources/Building Elements/Facade.md\|Facade]]</li><li>[[3 Resources/Building Elements/Thermal Break.md\|Thermal Break]]</li></ul> | [[3 Resources/Issues/Thermal Breaks Required per NCC2022.md\|Thermal Breaks Required per NCC2022]] | ☐ Architect shall check that appropriate thermal breaks have been allowed for. | | [[3 Resources/Areas/External Areas.md\|External Areas]] | <ul><li>[[3 Resources/Building Elements/Facade.md\|Facade]]</li><li>[[3 Resources/Building Elements/Thermal Break.md\|Thermal Break]]</li></ul> | [[3 Resources/Issues/Thermal Breaks Required per NCC2022.md\|Thermal Breaks Required per NCC2022]] | ☐ Façade Engineer shall check that appropriate thermal breaks have been allowed for. | | [[3 Resources/Areas/External Areas.md\|External Areas]] | <ul><li>[[3 Resources/Building Elements/External Walls.md\|External Walls]]</li><li>[[3 Resources/Building Elements/Roofs.md\|Roofs]]</li></ul> | [[3 Resources/Issues/Wall and Roof Assemblies need Interstitial Condensation Modelling.md\|Wall and Roof Assemblies need Interstitial Condensation Modelling]] | ☐ The Facade Engineer shall model all external roof and wall assemblies and verify that the mould growth index is 0. | | [[3 Resources/Areas/Facade.md\|Facade]] | <ul><li>[[3 Resources/Building Elements/External Walls.md\|External Walls]]</li></ul> | [[3 Resources/Issues/Base of Lightweight wall coverings not finished with a resilient trim.md\|Base of Lightweight wall coverings not finished with a resilient trim]] | ☐ Check that the base of cladded walls are finished with edge trims. | | [[3 Resources/Areas/Facade.md\|Facade]] | <ul><li>[[3 Resources/Building Elements/External Walls.md\|External Walls]]</li><li>[[3 Resources/Building Elements/Facade.md\|Facade]]</li></ul> | [[3 Resources/Issues/Intumescent Cavity Barriers.md\|Intumescent Cavity Barriers]] | ☐ Architect shall check that Intumescent Cavity Barriers are documented in the design drawings. | | [[3 Resources/Areas/Facade.md\|Facade]] | <ul><li>[[3 Resources/Building Elements/Expansion Joints.md\|Expansion Joints]]</li></ul> | [[3 Resources/Issues/Poor Detailing of Expansion Joints on Facades.md\|Poor Detailing of Expansion Joints on Facades]] | ☐ Architect shall document expansion joints on the façade on the External Elevations for the building. | | [[3 Resources/Areas/Facade.md\|Facade]] | <ul><li>[[3 Resources/Building Elements/Expansion Joints.md\|Expansion Joints]]</li></ul> | [[3 Resources/Issues/Poor Detailing of Expansion Joints on Facades.md\|Poor Detailing of Expansion Joints on Facades]] | ☐ Façade Engineer shall check the Detailing of the Facade's expansion joints. | | [[3 Resources/Areas/Roof.md\|Roof]] | <ul><li>[[3 Resources/Building Elements/External Walls.md\|External Walls]]</li><li>[[3 Resources/Building Elements/Roofs.md\|Roofs]]</li></ul> | [[3 Resources/Issues/Wall and Roof Assemblies need Interstitial Condensation Modelling.md\|Wall and Roof Assemblies need Interstitial Condensation Modelling]] | ☐ The Facade Engineer shall model all external roof and wall assemblies and verify that the mould growth index is 0. | | [[3 Resources/Areas/Roof.md\|Roof]] | <ul><li>[[3 Resources/Building Elements/Parapets.md\|Parapets]]</li></ul> | [[3 Resources/Issues/Weatherproofing Horizontal Surfaces.md\|Weatherproofing Horizontal Surfaces]] | ☐ Architect and Facade Engineer shall check that all horizontal surfaces (excluding exposed membrane) are protected with metal flashings. | %% DATAVIEW_PUBLISHER: end %%