# Hydraulic %% DATAVIEW_PUBLISHER: start ``` TABLE WITHOUT ID AREA, BuildingElement as Element,file.link as Issue,"☐ " + TASKS.text as Action FROM "3 Resources/Issues" FLATTEN file.tasks as TASKS FLATTEN Areas as AREA FLATTEN Disciplines as DISCIPLINE sort AREA ASC WHERE contains(DISCIPLINE,[[Hydraulic]]) ``` %% | AREA | Element | Issue | Action | | ------------------------------------------------------- | --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | -------------------------------------------------------------------------------------------------------------------------- | ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | | [[3 Resources/Areas/Balconies.md\|Balconies]] | <ul><li>[[3 Resources/Building Elements/Overflows.md\|Overflows]]</li></ul> | [[3 Resources/Issues/Overflows to Balconies and Wintergardens.md\|Overflows to Balconies and Wintergardens]] | ☐ Architect has checked that all balconies, courtyards and wintergardens have overflows. | | [[3 Resources/Areas/Balconies.md\|Balconies]] | <ul><li>[[3 Resources/Building Elements/Overflows.md\|Overflows]]</li></ul> | [[3 Resources/Issues/Overflows to Balconies and Wintergardens.md\|Overflows to Balconies and Wintergardens]] | ☐ Hydraulic Engineer has checked that all balconies, courtyards and wintergardens have overflows. | | [[3 Resources/Areas/Balconies.md\|Balconies]] | <ul><li>[[3 Resources/Building Elements/Overflows.md\|Overflows]]</li></ul> | [[3 Resources/Issues/Overflows to Balconies and Wintergardens.md\|Overflows to Balconies and Wintergardens]] | ☐ Architect shall check overflows are located on the floor plans, so they make sense visually on the elevations of the building. | | [[3 Resources/Areas/Basement.md\|Basement]] | <ul><li>[[3 Resources/Building Elements/Fire Hydrant.md\|Fire Hydrant]]</li></ul> | [[3 Resources/Issues/Fire Rated Hydrant Pipe Hangers .md\|Fire Rated Hydrant Pipe Hangers ]] | ☐ Hydraulic Engineer Shall specify on the hydraulic drawings the model of fire-rated hydrant hanger to be used. | | [[3 Resources/Areas/Basement.md\|Basement]] | <ul><li>[[3 Resources/Building Elements/Services.md\|Services]]</li></ul> | [[3 Resources/Issues/Impact Protection of Basement Services.md\|Impact Protection of Basement Services]] | ☐ Check that all services in the basement and ground floors are protected from traffic movements. Relocated them if it is not possible to use a bollard or barrier. | | [[3 Resources/Areas/Basement.md\|Basement]] | <ul><li>[[3 Resources/Building Elements/Pump Room.md\|Pump Room]]</li></ul> | [[3 Resources/Issues/Pump Room Clearance.md\|Pump Room Clearance]] | ☐ Hydraulic Consultant to provide accurate dimensions of pump room equipment. Ideally a 1:50 drawing of the pump room. | | [[3 Resources/Areas/Basement.md\|Basement]] | <ul><li>[[3 Resources/Building Elements/Pump Room.md\|Pump Room]]</li></ul> | [[3 Resources/Issues/Pump Room Clearance.md\|Pump Room Clearance]] | ☐ Architect to check that there is sufficient space in the pump room | | [[3 Resources/Areas/Basement.md\|Basement]] | <ul><li>[[3 Resources/Building Elements/Floorwastes.md\|Floorwastes]]</li></ul> | [[3 Resources/Issues/Waterproofing and Slab Deflections.md\|Waterproofing and Slab Deflections]] | ☐ Where possible Architect shall check that RWOs should be located in the middle of spans, as if the slab does deflect, water will still be directed to the RWOs. | | [[3 Resources/Areas/Basement.md\|Basement]] | <ul><li>[[3 Resources/Building Elements/Floorwastes.md\|Floorwastes]]</li></ul> | [[3 Resources/Issues/Waterproofing and Slab Deflections.md\|Waterproofing and Slab Deflections]] | ☐ Where possible Hydraulic Engineer shall check that RWOs should be located in the middle of spans, as if the slab does deflect, water will still be directed to the RWOs. | | [[3 Resources/Areas/Bathrooms.md\|Bathrooms]] | <ul><li>[[3 Resources/Building Elements/Bidet.md\|Bidet]]</li><li>[[3 Resources/Building Elements/Sales Contracts.md\|Sales Contracts]]</li></ul> | [[3 Resources/Issues/Bidets in Class 2 Buildings.md\|Bidets in Class 2 Buildings]] | ☐ Do not install Bidets in Class 2 Buildings. | | [[3 Resources/Areas/Bathrooms.md\|Bathrooms]] | <ul><li>[[3 Resources/Building Elements/Hot Water Supply.md\|Hot Water Supply]]</li></ul> | [[3 Resources/Issues/Excessive Dead Legs In Water Supply.md\|Excessive Dead Legs In Water Supply]] | ☐ Hydraulic Engineer shall design the hot-water system to provide hot-water to the kitchens and bathrooms in approximately 30 seconds. | | [[3 Resources/Areas/Courtyards.md\|Courtyards]] | <ul><li>[[3 Resources/Building Elements/Overflows.md\|Overflows]]</li></ul> | [[3 Resources/Issues/Overflows to Balconies and Wintergardens.md\|Overflows to Balconies and Wintergardens]] | ☐ Architect has checked that all balconies, courtyards and wintergardens have overflows. | | [[3 Resources/Areas/Courtyards.md\|Courtyards]] | <ul><li>[[3 Resources/Building Elements/Overflows.md\|Overflows]]</li></ul> | [[3 Resources/Issues/Overflows to Balconies and Wintergardens.md\|Overflows to Balconies and Wintergardens]] | ☐ Hydraulic Engineer has checked that all balconies, courtyards and wintergardens have overflows. | | [[3 Resources/Areas/Courtyards.md\|Courtyards]] | <ul><li>[[3 Resources/Building Elements/Overflows.md\|Overflows]]</li></ul> | [[3 Resources/Issues/Overflows to Balconies and Wintergardens.md\|Overflows to Balconies and Wintergardens]] | ☐ Architect shall check overflows are located on the floor plans, so they make sense visually on the elevations of the building. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Pipes.md\|Pipes]]</li><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li></ul> | [[3 Resources/Issues/Clash between Pipes, Fire Collars and Walls.md\|Clash between Pipes, Fire Collars and Walls]] | ☐ Architect shall indicate Fire Collars on all CSPs. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Pipes.md\|Pipes]]</li><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li></ul> | [[3 Resources/Issues/Clash between Pipes, Fire Collars and Walls.md\|Clash between Pipes, Fire Collars and Walls]] | ☐ Architect shall indicate Fire Collars from the CSP layer on the Wall Setout Plans for each level and check for clashes between walls and fire collars / pipes. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Sprinkler Pipe.md\|Sprinkler Pipe]]</li><li>[[3 Resources/Building Elements/Sprinkler Heads.md\|Sprinkler Heads]]</li></ul> | [[3 Resources/Issues/Fire Rated Sprinkler Pipe Supports.md\|Fire Rated Sprinkler Pipe Supports]] | ☐ Hydraulic Engineer Shall specify on the hydraulic drawings the model of fire-rated sprinkler pipe hanger to be used. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Fire Hydrant.md\|Fire Hydrant]]</li></ul> | [[3 Resources/Issues/Fire Hydrant Clearances.md\|Fire Hydrant Clearances]] | ☐ Architect to check there is sufficient clearance for Fire Hydrants at each location. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Fire Hydrant.md\|Fire Hydrant]]</li></ul> | [[3 Resources/Issues/Fire Hydrant Clearances.md\|Fire Hydrant Clearances]] | ☐ Hydraulic Engineer to check that there is sufficient clearance for Fire Hydrants at each location. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Water Connections.md\|Water Connections]]</li></ul> | [[3 Resources/Issues/Passive Fire Stopping for Metal Pipes.md\|Passive Fire Stopping for Metal Pipes]] | ☐ Builder Install AS1540.4 tested system in accordance with Option 3 above for all metal pipes. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li><li>[[3 Resources/Building Elements/Services.md\|Services]]</li></ul> | [[3 Resources/Issues/Passive Fire Documentation.md\|Passive Fire Documentation]] | ☐ Builder and Sub-contractors shall familiarize themselves with AS4072. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li><li>[[3 Resources/Building Elements/Services.md\|Services]]</li></ul> | [[3 Resources/Issues/Passive Fire Documentation.md\|Passive Fire Documentation]] | ☐ Builder shall provide one complete Passive Fire Register on Completion that complies with AS4072 | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Disciplines/Passive Fire.md\|Passive Fire]]</li><li>[[3 Resources/Building Elements/Fire Compartmentation.md\|Fire Compartmentation]]</li><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li><li>[[3 Resources/Building Elements/Drainage.md\|Drainage]]</li></ul> | [[3 Resources/Issues/PVC Penetrations Must Be Cored.md\|PVC Penetrations Must Be Cored]] | ☐ Plumber shall ensure that all round penetrations are drilled, not cut. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Service Cupboards.md\|Service Cupboards]]</li></ul> | [[3 Resources/Issues/Service Riser Coordination.md\|Service Riser Coordination]] | ☐ Architect to check that no wet areas are located above any service cupboards. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Service Cupboards.md\|Service Cupboards]]</li></ul> | [[3 Resources/Issues/Service Riser Coordination.md\|Service Riser Coordination]] | ☐ Architect to check that all service cupboards and risers are vertically aligned throughout the building. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Services.md\|Services]]</li><li>[[3 Resources/Building Elements/Fire Stairs.md\|Fire Stairs]]</li><li>[[3 Resources/Building Elements/Fire Exit.md\|Fire Exit]]</li></ul> | [[3 Resources/Issues/Services in Fire Stairs and Exits.md\|Services in Fire Stairs and Exits]] | ☐ Architect shall check that no services (other than those related to the fire system) are located in fire stairs. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Services.md\|Services]]</li><li>[[3 Resources/Building Elements/Fire Stairs.md\|Fire Stairs]]</li><li>[[3 Resources/Building Elements/Fire Exit.md\|Fire Exit]]</li></ul> | [[3 Resources/Issues/Services in Fire Stairs and Exits.md\|Services in Fire Stairs and Exits]] | ☐ Hydraulic Engineer shall check that no services (other than those related to the fire system) are located in fire stairs. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Services.md\|Services]]</li><li>[[3 Resources/Building Elements/Fire Stairs.md\|Fire Stairs]]</li><li>[[3 Resources/Building Elements/Fire Exit.md\|Fire Exit]]</li></ul> | [[3 Resources/Issues/Services in Fire Stairs and Exits.md\|Services in Fire Stairs and Exits]] | ☐ Electrical Engineer shall check that no services (other than those related to the fire system) are located in fire stairs. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Services.md\|Services]]</li><li>[[3 Resources/Building Elements/Fire Stairs.md\|Fire Stairs]]</li><li>[[3 Resources/Building Elements/Fire Exit.md\|Fire Exit]]</li></ul> | [[3 Resources/Issues/Services in Fire Stairs and Exits.md\|Services in Fire Stairs and Exits]] | ☐ Mechanical Engineer shall check that no services (other than those related to the fire system) are located in fire stairs. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Disciplines/Passive Fire.md\|Passive Fire]]</li><li>[[3 Resources/Building Elements/Fire Compartmentation.md\|Fire Compartmentation]]</li><li>[[3 Resources/Building Elements/Services.md\|Services]]</li></ul> | [[3 Resources/Issues/Services Installed Before Walls.md\|Services Installed Before Walls]] | ☐ Builder shall ensure that all walls are installed before services installation commences. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Fire Compartmentation.md\|Fire Compartmentation]]</li><li>[[3 Resources/Building Elements/Drainage.md\|Drainage]]</li></ul> | [[3 Resources/Issues/Top Track installed over Cast in Collars Flange.md\|Top Track installed over Cast in Collars Flange]] | ☐ Builder shall ensure that top tracks are not installed on top of cast in collar flanges. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Water Connections.md\|Water Connections]]</li><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li></ul> | [[3 Resources/Issues/Unicollar Installation Around Pex Pipe.md\|Unicollar Installation Around Pex Pipe]] | ☐ Builder shall ensure all Unicollar installations are compliant. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Membrane.md\|Membrane]]</li></ul> | [[3 Resources/Issues/Waterproofing Penetration Setout.md\|Waterproofing Penetration Setout]] | ☐ Architect to check that all service penetrations have minimum 100mm clearance from other vertical faces. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Membrane.md\|Membrane]]</li></ul> | [[3 Resources/Issues/Waterproofing Penetration Setout.md\|Waterproofing Penetration Setout]] | ☐ Service Engineers to detail at 1:20 areas that are clustered with multiple penetrations like service cupboard risers. | | [[3 Resources/Areas/External Areas.md\|External Areas]] | <ul><li>[[3 Resources/Building Elements/Garden Taps.md\|Garden Taps]]</li></ul> | [[3 Resources/Issues/Provide Backflow Devices to Garden Taps.md\|Provide Backflow Devices to Garden Taps]] | ☐ Project Manager shall check that Backflow devices are provided to all Garden Taps. | | [[3 Resources/Areas/External Areas.md\|External Areas]] | <ul><li>[[3 Resources/Building Elements/Garden Taps.md\|Garden Taps]]</li></ul> | [[3 Resources/Issues/Provide Backflow Devices to Garden Taps.md\|Provide Backflow Devices to Garden Taps]] | ☐ Hydraulic Engineer shall note this requirement on the Hydraulic Drawings. | | [[3 Resources/Areas/External Areas.md\|External Areas]] | <ul><li>[[3 Resources/Building Elements/Garden Taps.md\|Garden Taps]]</li></ul> | [[3 Resources/Issues/Provide Backflow Devices to Garden Taps.md\|Provide Backflow Devices to Garden Taps]] | ☐ Hydraulic Engineer shall note this requirement in the Hydraulic Specification. | | [[3 Resources/Areas/Ground Floor.md\|Ground Floor]] | <ul><li>[[3 Resources/Building Elements/Fire Hydrant.md\|Fire Hydrant]]</li></ul> | [[3 Resources/Issues/Fire Rated Hydrant Pipe Hangers .md\|Fire Rated Hydrant Pipe Hangers ]] | ☐ Hydraulic Engineer Shall specify on the hydraulic drawings the model of fire-rated hydrant hanger to be used. | | [[3 Resources/Areas/Ground Floor.md\|Ground Floor]] | <ul><li>[[3 Resources/Building Elements/Services.md\|Services]]</li></ul> | [[3 Resources/Issues/Impact Protection of Basement Services.md\|Impact Protection of Basement Services]] | ☐ Check that all services in the basement and ground floors are protected from traffic movements. Relocated them if it is not possible to use a bollard or barrier. | | [[3 Resources/Areas/Ground Floor.md\|Ground Floor]] | <ul><li>[[3 Resources/Building Elements/Pump Room.md\|Pump Room]]</li></ul> | [[3 Resources/Issues/Pump Room Clearance.md\|Pump Room Clearance]] | ☐ Hydraulic Consultant to provide accurate dimensions of pump room equipment. Ideally a 1:50 drawing of the pump room. | | [[3 Resources/Areas/Ground Floor.md\|Ground Floor]] | <ul><li>[[3 Resources/Building Elements/Pump Room.md\|Pump Room]]</li></ul> | [[3 Resources/Issues/Pump Room Clearance.md\|Pump Room Clearance]] | ☐ Architect to check that there is sufficient space in the pump room | | [[3 Resources/Areas/Kitchens.md\|Kitchens]] | <ul><li>[[3 Resources/Building Elements/Hot Water Supply.md\|Hot Water Supply]]</li></ul> | [[3 Resources/Issues/Excessive Dead Legs In Water Supply.md\|Excessive Dead Legs In Water Supply]] | ☐ Hydraulic Engineer shall design the hot-water system to provide hot-water to the kitchens and bathrooms in approximately 30 seconds. | | [[3 Resources/Areas/Living Areas.md\|Living Areas]] | <ul><li>[[3 Resources/Building Elements/Compact Laundry.md\|Compact Laundry]]</li></ul> | [[3 Resources/Issues/Compact Laundries Require Floor Wastes.md\|Compact Laundries Require Floor Wastes]] | ☐ Architect to check that Laundries in living areas have been provided with Floor wastes. | | [[3 Resources/Areas/Living Areas.md\|Living Areas]] | <ul><li>[[3 Resources/Building Elements/Compact Laundry.md\|Compact Laundry]]</li></ul> | [[3 Resources/Issues/Compact Laundries Require Floor Wastes.md\|Compact Laundries Require Floor Wastes]] | ☐ Hydraulic Engineer to check that Laundries in living areas have been provided with floor wastes. | | [[3 Resources/Areas/Lobbies.md\|Lobbies]] | <ul><li>[[3 Resources/Building Elements/Service Cupboards.md\|Service Cupboards]]</li></ul> | [[3 Resources/Issues/Congested Riser Cupboards.md\|Congested Riser Cupboards]] | ☐ Service Consultants shall prepare 1:20 drawings of each floor's service cupboards and nominate and depict the fire-stopping methods on those drawings and any associated meters. | | [[3 Resources/Areas/Lobbies.md\|Lobbies]] | <ul><li>[[3 Resources/Building Elements/Service Cupboards.md\|Service Cupboards]]</li></ul> | [[3 Resources/Issues/Congested Riser Cupboards.md\|Congested Riser Cupboards]] | ☐ Architect shall prepare standard service cupboards for all services including Water, Electrical, Mechanical and Fire | | [[3 Resources/Areas/Roof.md\|Roof]] | <ul><li>[[3 Resources/Building Elements/Floorwastes.md\|Floorwastes]]</li></ul> | [[3 Resources/Issues/Waterproofing and Slab Deflections.md\|Waterproofing and Slab Deflections]] | ☐ Where possible Architect shall check that RWOs should be located in the middle of spans, as if the slab does deflect, water will still be directed to the RWOs. | | [[3 Resources/Areas/Roof.md\|Roof]] | <ul><li>[[3 Resources/Building Elements/Floorwastes.md\|Floorwastes]]</li></ul> | [[3 Resources/Issues/Waterproofing and Slab Deflections.md\|Waterproofing and Slab Deflections]] | ☐ Where possible Hydraulic Engineer shall check that RWOs should be located in the middle of spans, as if the slab does deflect, water will still be directed to the RWOs. | | [[3 Resources/Areas/Wintergardens.md\|Wintergardens]] | <ul><li>[[3 Resources/Building Elements/Overflows.md\|Overflows]]</li></ul> | [[3 Resources/Issues/Overflows to Balconies and Wintergardens.md\|Overflows to Balconies and Wintergardens]] | ☐ Architect has checked that all balconies, courtyards and wintergardens have overflows. | | [[3 Resources/Areas/Wintergardens.md\|Wintergardens]] | <ul><li>[[3 Resources/Building Elements/Overflows.md\|Overflows]]</li></ul> | [[3 Resources/Issues/Overflows to Balconies and Wintergardens.md\|Overflows to Balconies and Wintergardens]] | ☐ Hydraulic Engineer has checked that all balconies, courtyards and wintergardens have overflows. | | [[3 Resources/Areas/Wintergardens.md\|Wintergardens]] | <ul><li>[[3 Resources/Building Elements/Overflows.md\|Overflows]]</li></ul> | [[3 Resources/Issues/Overflows to Balconies and Wintergardens.md\|Overflows to Balconies and Wintergardens]] | ☐ Architect shall check overflows are located on the floor plans, so they make sense visually on the elevations of the building. | %% DATAVIEW_PUBLISHER: end %%