# Passive Fire %% DATAVIEW_PUBLISHER: start ``` TABLE WITHOUT ID AREA, BuildingElement as Element,file.link as Issue,TASKS.text as Action FROM "3 Resources/Issues" FLATTEN file.tasks as TASKS FLATTEN Areas as AREA FLATTEN Disciplines as DISCIPLINE sort AREA ASC WHERE contains(DISCIPLINE,[[Passive Fire]]) ``` %% | AREA | Element | Issue | Action | | ----------------------------------------------- | --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | -------------------------------------------------------------------------------------------------------------------------- | ----------------------------------------------------------------------------------------------------------------------------------------- | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/NBN.md\|NBN]]</li><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li></ul> | [[3 Resources/Issues/NBN Conduits Cast Into Slab.md\|NBN Conduits Cast Into Slab]] | Ensure no NBN Conduits are cast into the slab and are instead fire-stopped at the EDB / Comms Cupboards | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/NBN.md\|NBN]]</li></ul> | [[3 Resources/Issues/NBN Penetrations in Hebel Walls.md\|NBN Penetrations in Hebel Walls]] | Build to verify that all NBN Conduits are installed with an inset collar rather than face fixed collar. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Air Conditioning.md\|Air Conditioning]]</li></ul> | [[3 Resources/Issues/Pair Coil Insulation Material.md\|Pair Coil Insulation Material]] | Mechanical contractor shall provide AS1530.3 test certificates for Pair coil insulation used to the certifier prior to installation. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Water Connections.md\|Water Connections]]</li></ul> | [[3 Resources/Issues/Passive Fire Stopping for Metal Pipes.md\|Passive Fire Stopping for Metal Pipes]] | Builder Install AS1540.4 tested system in accordance with Option 3 above for all metal pipes. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li><li>[[3 Resources/Building Elements/Services.md\|Services]]</li></ul> | [[3 Resources/Issues/Passive Fire Documentation.md\|Passive Fire Documentation]] | Builder and Sub-contractors shall familiarize themselves with AS4072. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li><li>[[3 Resources/Building Elements/Services.md\|Services]]</li></ul> | [[3 Resources/Issues/Passive Fire Documentation.md\|Passive Fire Documentation]] | Builder shall provide one complete Passive Fire Register on Completion that complies with AS4072 | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Cables.md\|Cables]]</li><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li></ul> | [[3 Resources/Issues/Poor Installation of Mastic Around Cables.md\|Poor Installation of Mastic Around Cables]] | Builder shall ensure that all mastic'd cables are sealed correctly | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Disciplines/Passive Fire.md\|Passive Fire]]</li><li>[[3 Resources/Building Elements/Fire Compartmentation.md\|Fire Compartmentation]]</li><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li><li>[[3 Resources/Building Elements/Drainage.md\|Drainage]]</li></ul> | [[3 Resources/Issues/PVC Penetrations Must Be Cored.md\|PVC Penetrations Must Be Cored]] | Plumber shall ensure that all round penetrations are drilled, not cut. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Disciplines/Passive Fire.md\|Passive Fire]]</li><li>[[3 Resources/Building Elements/Services.md\|Services]]</li></ul> | [[3 Resources/Issues/Sealing Up Unused Cast In Collars.md\|Sealing Up Unused Cast In Collars]] | Builder shall check that all unused cast-in Penetrations are sealed up correctly. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Disciplines/Passive Fire.md\|Passive Fire]]</li><li>[[3 Resources/Building Elements/Fire Compartmentation.md\|Fire Compartmentation]]</li><li>[[3 Resources/Building Elements/Services.md\|Services]]</li></ul> | [[3 Resources/Issues/Services Installed Before Walls.md\|Services Installed Before Walls]] | Builder shall ensure that all walls are installed before services installation commences. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Fire Compartmentation.md\|Fire Compartmentation]]</li><li>[[3 Resources/Building Elements/Drainage.md\|Drainage]]</li></ul> | [[3 Resources/Issues/Top Track installed over Cast in Collars Flange.md\|Top Track installed over Cast in Collars Flange]] | Builder shall ensure that top tracks are not installed on top of cast in collar flanges. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Water Connections.md\|Water Connections]]</li><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li></ul> | [[3 Resources/Issues/Unicollar Installation Around Pex Pipe.md\|Unicollar Installation Around Pex Pipe]] | Builder shall ensure all Unicollar installations are compliant. | | [[3 Resources/Areas/Lobbies.md\|Lobbies]] | <ul><li>[[3 Resources/Building Elements/Service Riser.md\|Service Riser]]</li><li>[[3 Resources/Building Elements/Service Cupboards.md\|Service Cupboards]]</li></ul> | [[3 Resources/Issues/Electrical Riser Design Principles.md\|Electrical Riser Design Principles]] | Builder to review Electrical Riser Passive Fire Design Principles (This article), when review the fire-stopping of electrical risers etc. | %% DATAVIEW_PUBLISHER: end %%