# Project Management %% DATAVIEW_PUBLISHER: start ``` TABLE WITHOUT ID AREA, BuildingElement as Element,file.link as Issue,"☐ " + TASKS.text as Action FROM "3 Resources/Issues" FLATTEN file.tasks as TASKS FLATTEN Areas as AREA FLATTEN Disciplines as DISCIPLINE sort AREA ASC WHERE contains(DISCIPLINE,[[Project Management]]) ``` %% | AREA | Element | Issue | Action | | ------------------------------------------------------- | ------------------------------------------------------------------------------------------------------------------------------------------------- | ---------------------------------------------------------------------------------------------------------------------------- | -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | | [[3 Resources/Areas/Balconies.md\|Balconies]] | <ul><li>[[3 Resources/Building Elements/Facade.md\|Facade]]</li></ul> | [[3 Resources/Issues/Facade Cladding Finish Height.md\|Facade Cladding Finish Height]] | ☐ Architect has checked that the finished level of any façade cladding is documented to be just below the finished level of the pedestal pavers and there is a gap to service the membrane. | | [[3 Resources/Areas/Balconies.md\|Balconies]] | <ul><li>[[3 Resources/Building Elements/Facade.md\|Facade]]</li></ul> | [[3 Resources/Issues/Facade Cladding Finish Height.md\|Facade Cladding Finish Height]] | ☐ Project Manager has checked that the finished level of any façade cladding is documented to be just below the finished level of the pedestal pavers and there is a gap to service the membrane. | | [[3 Resources/Areas/Basement.md\|Basement]] | <ul><li>[[3 Resources/Building Elements/Fire Hydrant.md\|Fire Hydrant]]</li></ul> | [[3 Resources/Issues/Fire Rated Hydrant Pipe Hangers .md\|Fire Rated Hydrant Pipe Hangers ]] | ☐ Hydraulic Engineer Shall specify on the hydraulic drawings the model of fire-rated hydrant hanger to be used. | | [[3 Resources/Areas/Bathrooms.md\|Bathrooms]] | <ul><li>[[3 Resources/Disciplines/Structure.md\|Structure]]</li></ul> | [[3 Resources/Issues/No Evidence of Falls.md\|No Evidence of Falls]] | ☐ Check that Builder is capturing a survey of the substrate prior to installing the screed and bathroom tiles on each floor. | | [[3 Resources/Areas/Bathrooms.md\|Bathrooms]] | <ul><li>[[3 Resources/Building Elements/Access Panels.md\|Access Panels]]</li></ul> | [[3 Resources/Issues/Provide Flanged Access Panels.md\|Provide Flanged Access Panels]] | ☐ Project Manager shall check that Flanged Access panels are used throughout in lieu of "Set-Bead" Access Panels. | | [[3 Resources/Areas/Bathrooms.md\|Bathrooms]] | <ul><li>[[3 Resources/Building Elements/Access Panels.md\|Access Panels]]</li></ul> | [[3 Resources/Issues/Provide Flanged Access Panels.md\|Provide Flanged Access Panels]] | ☐ Architect shall check that Flanged Access panels are used throughout in lieu of "Set-Bead" Access Panels. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Building Elements/Handover.md\|Handover]]</li></ul> | [[3 Resources/Issues/Common Deficiencies in Handover Documentation.md\|Common Deficiencies in Handover Documentation]] | ☐ Project Manager shall ensure that the builder provides all items listed on the handover checklist. | | [[3 Resources/Areas/Everywhere.md\|Everywhere]] | <ul><li>[[3 Resources/Disciplines/Structure.md\|Structure]]</li></ul> | [[3 Resources/Issues/No Evidence of Falls.md\|No Evidence of Falls]] | ☐ Check that Builder is capturing a survey of the substrate prior to installing the screed and bathroom tiles on each floor. | | [[3 Resources/Areas/External Areas.md\|External Areas]] | <ul><li>[[3 Resources/Building Elements/Masonry Walls.md\|Masonry Walls]]</li><li>[[3 Resources/Building Elements/Facade.md\|Facade]]</li></ul> | [[3 Resources/Issues/Effluorescence from Mortar Mix.md\|Effluorescence from Mortar Mix]] | ☐ the Project Manager shall ensure that only washed river sand is used for the mortar mix. | | [[3 Resources/Areas/External Areas.md\|External Areas]] | <ul><li>[[3 Resources/Building Elements/Masonry Walls.md\|Masonry Walls]]</li><li>[[3 Resources/Building Elements/Facade.md\|Facade]]</li></ul> | [[3 Resources/Issues/Effluorescence from Mortar Mix.md\|Effluorescence from Mortar Mix]] | ☐ The Project Manager shall ensure that an appropriate additive like [Efflock](https://www.efflock.com.au/) is used to further reduce the risk of efflorescence. | | [[3 Resources/Areas/External Areas.md\|External Areas]] | <ul><li>[[3 Resources/Building Elements/Masonry Walls.md\|Masonry Walls]]</li></ul> | [[3 Resources/Issues/Seal External Facing Masonry and Blockwork Walls.md\|Seal External Facing Masonry and Blockwork Walls]] | ☐ Architect to detail masonry sealer to external walls. | | [[3 Resources/Areas/External Areas.md\|External Areas]] | <ul><li>[[3 Resources/Building Elements/Masonry Walls.md\|Masonry Walls]]</li></ul> | [[3 Resources/Issues/Seal External Facing Masonry and Blockwork Walls.md\|Seal External Facing Masonry and Blockwork Walls]] | ☐ Project Manager shall check that details of this are included in the Owner's Manuals. | | [[3 Resources/Areas/External Areas.md\|External Areas]] | <ul><li>[[3 Resources/Building Elements/Garden Taps.md\|Garden Taps]]</li></ul> | [[3 Resources/Issues/Provide Backflow Devices to Garden Taps.md\|Provide Backflow Devices to Garden Taps]] | ☐ Project Manager shall check that Backflow devices are provided to all Garden Taps. | | [[3 Resources/Areas/External Areas.md\|External Areas]] | <ul><li>[[3 Resources/Building Elements/Garden Taps.md\|Garden Taps]]</li></ul> | [[3 Resources/Issues/Provide Backflow Devices to Garden Taps.md\|Provide Backflow Devices to Garden Taps]] | ☐ Hydraulic Engineer shall note this requirement on the Hydraulic Drawings. | | [[3 Resources/Areas/External Areas.md\|External Areas]] | <ul><li>[[3 Resources/Building Elements/Garden Taps.md\|Garden Taps]]</li></ul> | [[3 Resources/Issues/Provide Backflow Devices to Garden Taps.md\|Provide Backflow Devices to Garden Taps]] | ☐ Hydraulic Engineer shall note this requirement in the Hydraulic Specification. | | [[3 Resources/Areas/Facade.md\|Facade]] | <ul><li>[[3 Resources/Building Elements/Masonry Walls.md\|Masonry Walls]]</li><li>[[3 Resources/Building Elements/Facade.md\|Facade]]</li></ul> | [[3 Resources/Issues/Effluorescence from Mortar Mix.md\|Effluorescence from Mortar Mix]] | ☐ the Project Manager shall ensure that only washed river sand is used for the mortar mix. | | [[3 Resources/Areas/Facade.md\|Facade]] | <ul><li>[[3 Resources/Building Elements/Masonry Walls.md\|Masonry Walls]]</li><li>[[3 Resources/Building Elements/Facade.md\|Facade]]</li></ul> | [[3 Resources/Issues/Effluorescence from Mortar Mix.md\|Effluorescence from Mortar Mix]] | ☐ The Project Manager shall ensure that an appropriate additive like [Efflock](https://www.efflock.com.au/) is used to further reduce the risk of efflorescence. | | [[3 Resources/Areas/Facade.md\|Facade]] | <ul><li>[[3 Resources/Building Elements/External Walls.md\|External Walls]]</li></ul> | [[3 Resources/Issues/Mismatched Acrylic Render and Paint.md\|Mismatched Acrylic Render and Paint]] | ☐ Ensure that all rendered walls are finished with a coat of paint - colored render will not be accepted as the final finish. | | [[3 Resources/Areas/Ground Floor.md\|Ground Floor]] | <ul><li>[[3 Resources/Building Elements/Fire Hydrant.md\|Fire Hydrant]]</li></ul> | [[3 Resources/Issues/Fire Rated Hydrant Pipe Hangers .md\|Fire Rated Hydrant Pipe Hangers ]] | ☐ Hydraulic Engineer Shall specify on the hydraulic drawings the model of fire-rated hydrant hanger to be used. | | [[3 Resources/Areas/Laundry.md\|Laundry]] | <ul><li>[[3 Resources/Disciplines/Structure.md\|Structure]]</li></ul> | [[3 Resources/Issues/No Evidence of Falls.md\|No Evidence of Falls]] | ☐ Check that Builder is capturing a survey of the substrate prior to installing the screed and bathroom tiles on each floor. | | [[3 Resources/Areas/Living Areas.md\|Living Areas]] | <ul><li>[[3 Resources/Building Elements/Access Panels.md\|Access Panels]]</li></ul> | [[3 Resources/Issues/Provide Flanged Access Panels.md\|Provide Flanged Access Panels]] | ☐ Project Manager shall check that Flanged Access panels are used throughout in lieu of "Set-Bead" Access Panels. | | [[3 Resources/Areas/Living Areas.md\|Living Areas]] | <ul><li>[[3 Resources/Building Elements/Access Panels.md\|Access Panels]]</li></ul> | [[3 Resources/Issues/Provide Flanged Access Panels.md\|Provide Flanged Access Panels]] | ☐ Architect shall check that Flanged Access panels are used throughout in lieu of "Set-Bead" Access Panels. | | [[3 Resources/Areas/Living Areas.md\|Living Areas]] | <ul><li>[[3 Resources/Building Elements/Timber Flooring.md\|Timber Flooring]]</li></ul> | [[3 Resources/Issues/Timber Flooring Squeaks.md\|Timber Flooring Squeaks]] | ☐ Project Manager shall ensure that the Builder Installs Dual Bond Flooring System. | | [[3 Resources/Areas/Living Areas.md\|Living Areas]] | <ul><li>[[3 Resources/Building Elements/Timber Flooring.md\|Timber Flooring]]</li></ul> | [[3 Resources/Issues/Timber Flooring Squeaks.md\|Timber Flooring Squeaks]] | ☐ Architect Shall allow for 30mm of floor levelling compound when setting out the floor to floor levels of the building. | | [[3 Resources/Areas/Roof.md\|Roof]] | <ul><li>[[3 Resources/Disciplines/Structure.md\|Structure]]</li></ul> | [[3 Resources/Issues/No Evidence of Falls.md\|No Evidence of Falls]] | ☐ Check that Builder is capturing a survey of the substrate prior to installing the screed and bathroom tiles on each floor. | | [[3 Resources/Areas/Wet Areas.md\|Wet Areas]] | <ul><li>[[3 Resources/Disciplines/Structure.md\|Structure]]</li></ul> | [[3 Resources/Issues/No Evidence of Falls.md\|No Evidence of Falls]] | ☐ Check that Builder is capturing a survey of the substrate prior to installing the screed and bathroom tiles on each floor. | | [[3 Resources/Building Elements/Balcony.md\|Balcony]] | <ul><li>[[3 Resources/Disciplines/Structure.md\|Structure]]</li></ul> | [[3 Resources/Issues/No Evidence of Falls.md\|No Evidence of Falls]] | ☐ Check that Builder is capturing a survey of the substrate prior to installing the screed and bathroom tiles on each floor. | %% DATAVIEW_PUBLISHER: end %%