## Issue Description:
- It is often good practice to provide a double layer membrane system.
- Detailing around puddle flanges is especially important when using this system.
- The benefit of using a double membrane will be compromised if it not detailed correctly.
- The puddle flange junction shall be detailed so that tHe screed underneath the top layer of membrane shall be capable of draining.
- This issue is neatly explained in this video created by GripSet [How Puddle Flanges Work to Drain Below Screed](https://www.youtube.com/watch?v=1lM_9S7OYcI&t=343s&ab_channel=GripsetIndustriesPTYLtd)
## Actions to Prevent this Issue:
- [ ] Architect shall check that the puddle flange junction shall be detailed so that the screed underneath the top layer of membrane shall be capable of draining.