# Mailout January 25 ## Navigation [[Home]] [[Areas|Areas]] [[Building Elements]] [[Disciplines]] [[Issues]] # Welcome! Welcome to [Issue Vault](https://issuevault.org/) You may have previously received some emails from me - I have moved all of this information to a centralized website for future refence. On this site you will find some common construction issues we have encountered along with some proposed Actions to Prevent these Issues from occurring in the future. # Issue of the Month: ![[Bidets in Class 2 Buildings]] # Recently Created Issues %% DATAVIEW_PUBLISHER: start ``` TABLE WITHOUT ID BuildingElement as Element,file.link as Issue, file.mtime as Modified FROM "3 Resources/Issues" WHERE file.cday >= (this.file.cday - dur(14 days)) sort file.cday DESC ``` %% | Element | Issue | Modified | | ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | ---------------------------------------------------------------------------------------------------------------------------------------------------------- | ---------------------------- | | <ul><li>[[3 Resources/Building Elements/Tiling.md\|Tiling]]</li><li>[[3 Resources/Building Elements/Pedestal Pavers.md\|Pedestal Pavers]]</li></ul> | [[3 Resources/Issues/Pedestal Paving Specification.md\|Pedestal Paving Specification]] | 4:51 PM - March 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Service Riser.md\|Service Riser]]</li><li>[[3 Resources/Building Elements/Service Cupboards.md\|Service Cupboards]]</li></ul> | [[3 Resources/Issues/Electrical Riser Design Principles.md\|Electrical Riser Design Principles]] | 4:45 PM - February 27, 2025 | | <ul><li>[[3 Resources/Building Elements/NBN.md\|NBN]]</li><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li></ul> | [[3 Resources/Issues/NBN Conduits Cast Into Slab.md\|NBN Conduits Cast Into Slab]] | 4:32 PM - February 27, 2025 | | <ul><li>[[3 Resources/Building Elements/NBN.md\|NBN]]</li></ul> | [[3 Resources/Issues/NBN Penetrations in Hebel Walls.md\|NBN Penetrations in Hebel Walls]] | 4:23 PM - February 27, 2025 | | <ul><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li><li>[[3 Resources/Building Elements/Services.md\|Services]]</li></ul> | [[3 Resources/Issues/Passive Fire Documentation.md\|Passive Fire Documentation]] | 4:44 PM - February 27, 2025 | | <ul><li>[[3 Resources/Building Elements/Sprinkler Pipe.md\|Sprinkler Pipe]]</li></ul> | [[3 Resources/Issues/Sprinkler Pipe too close to other services.md\|Sprinkler Pipe too close to other services]] | 4:19 PM - February 27, 2025 | | <ul><li>[[3 Resources/Disciplines/Passive Fire.md\|Passive Fire]]</li><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li><li>[[3 Resources/Building Elements/Fire Compartmentation.md\|Fire Compartmentation]]</li><li>[[3 Resources/Building Elements/Hebel Walls.md\|Hebel Walls]]</li></ul> | [[3 Resources/Issues/Hebel Walls Must Be Constructed First.md\|Hebel Walls Must Be Constructed First]] | 12:16 PM - February 25, 2025 | | <ul><li>[[3 Resources/Building Elements/Water Connections.md\|Water Connections]]</li></ul> | [[3 Resources/Issues/Passive Fire Stopping for Metal Pipes.md\|Passive Fire Stopping for Metal Pipes]] | 4:51 PM - February 26, 2025 | | <ul><li>[[3 Resources/Disciplines/Passive Fire.md\|Passive Fire]]</li><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li><li>[[3 Resources/Building Elements/Fire Compartmentation.md\|Fire Compartmentation]]</li></ul> | [[3 Resources/Issues/Plasterboard Walls Must be Constructed First.md\|Plasterboard Walls Must be Constructed First]] | 12:13 PM - February 25, 2025 | | <ul><li>[[3 Resources/Building Elements/Cables.md\|Cables]]</li><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li></ul> | [[3 Resources/Issues/Poor Installation of Mastic Around Cables.md\|Poor Installation of Mastic Around Cables]] | 12:54 PM - February 25, 2025 | | <ul><li>[[3 Resources/Disciplines/Passive Fire.md\|Passive Fire]]</li><li>[[3 Resources/Building Elements/Fire Compartmentation.md\|Fire Compartmentation]]</li><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li><li>[[3 Resources/Building Elements/Drainage.md\|Drainage]]</li></ul> | [[3 Resources/Issues/PVC Penetrations Must Be Cored.md\|PVC Penetrations Must Be Cored]] | 12:22 PM - February 25, 2025 | | <ul><li>[[3 Resources/Disciplines/Passive Fire.md\|Passive Fire]]</li><li>[[3 Resources/Building Elements/Services.md\|Services]]</li></ul> | [[3 Resources/Issues/Sealing Up Unused Cast In Collars.md\|Sealing Up Unused Cast In Collars]] | 12:32 PM - February 25, 2025 | | <ul><li>[[3 Resources/Disciplines/Passive Fire.md\|Passive Fire]]</li><li>[[3 Resources/Building Elements/Fire Compartmentation.md\|Fire Compartmentation]]</li><li>[[3 Resources/Building Elements/Services.md\|Services]]</li></ul> | [[3 Resources/Issues/Services Installed Before Walls.md\|Services Installed Before Walls]] | 12:24 PM - February 25, 2025 | | <ul><li>[[3 Resources/Building Elements/Fire Compartmentation.md\|Fire Compartmentation]]</li><li>[[3 Resources/Building Elements/Drainage.md\|Drainage]]</li></ul> | [[3 Resources/Issues/Top Track installed over Cast in Collars Flange.md\|Top Track installed over Cast in Collars Flange]] | 12:40 PM - February 25, 2025 | | <ul><li>[[3 Resources/Building Elements/Water Connections.md\|Water Connections]]</li><li>[[3 Resources/Building Elements/Internal Walls.md\|Internal Walls]]</li></ul> | [[3 Resources/Issues/Unicollar Installation Around Pex Pipe.md\|Unicollar Installation Around Pex Pipe]] | 12:46 PM - February 25, 2025 | | <ul><li>[[3 Resources/Building Elements/Tiling.md\|Tiling]]</li></ul> | [[3 Resources/Issues/Bathroom Wall Tile Setouts.md\|Bathroom Wall Tile Setouts]] | 2:55 PM - February 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Handover.md\|Handover]]</li></ul> | [[3 Resources/Issues/Common Deficiencies in Handover Documentation.md\|Common Deficiencies in Handover Documentation]] | 3:28 PM - February 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Windows.md\|Windows]]</li></ul> | [[3 Resources/Issues/Splits in MDF Pelmets.md\|Splits in MDF Pelmets]] | 11:19 AM - February 18, 2025 | | <ul><li>[[3 Resources/Building Elements/Air Conditioning.md\|Air Conditioning]]</li></ul> | [[3 Resources/Issues/Condensate Lines Need to Be Accessible.md\|Condensate Lines Need to Be Accessible]] | 2:40 PM - February 07, 2025 | | <ul><li>[[3 Resources/Building Elements/Dryer.md\|Dryer]]</li><li>[[3 Resources/Building Elements/Washing Machine.md\|Washing Machine]]</li></ul> | [[3 Resources/Issues/Allow for Noise Reduction Provision to all Laundries.md\|Allow for Noise Reduction Provision to all Laundries]] | 4:26 PM - February 03, 2025 | | <ul><li>[[3 Resources/Building Elements/Bathroom Exhaust.md\|Bathroom Exhaust]]</li><li>[[3 Resources/Building Elements/Laundry Exhaust.md\|Laundry Exhaust]]</li><li>[[3 Resources/Building Elements/Fresh Air Supply.md\|Fresh Air Supply]]</li><li>[[3 Resources/Building Elements/Kitchen Exhaust.md\|Kitchen Exhaust]]</li></ul> | [[3 Resources/Issues/Add provision for constant ventilation.md\|Add provision for constant ventilation]] | 3:59 PM - February 03, 2025 | | <ul><li>[[3 Resources/Building Elements/Exhaust Ducts.md\|Exhaust Ducts]]</li></ul> | [[3 Resources/Issues/Excessive use of Flexible Ducitng leads to Poor Exhaust Systems.md\|Excessive use of Flexible Ducitng leads to Poor Exhaust Systems]] | 3:46 PM - February 03, 2025 | | <ul><li>[[3 Resources/Building Elements/Water Connections.md\|Water Connections]]</li></ul> | [[3 Resources/Issues/Services Installed inaccessible bathroom hobbs.md\|Services Installed inaccessible bathroom hobbs]] | 4:15 PM - February 03, 2025 | | <ul><li>[[3 Resources/Building Elements/Fire Doors.md\|Fire Doors]]</li><li>[[3 Resources/Building Elements/Timber Flooring.md\|Timber Flooring]]</li><li>[[3 Resources/Building Elements/Tiling.md\|Tiling]]</li><li>[[3 Resources/Building Elements/Carpet.md\|Carpet]]</li></ul> | [[3 Resources/Issues/Uneven floor finish below fire doors.md\|Uneven floor finish below fire doors]] | 4:21 PM - February 03, 2025 | | <ul><li>[[3 Resources/Building Elements/Air Conditioning.md\|Air Conditioning]]</li></ul> | [[3 Resources/Issues/Vibration from Condenser Units.md\|Vibration from Condenser Units]] | 4:03 PM - February 03, 2025 | | <ul><li>[[3 Resources/Building Elements/Bathroom Exhaust.md\|Bathroom Exhaust]]</li></ul> | [[3 Resources/Issues/Bathroom Exhaust Fan and Water Vapour.md\|Bathroom Exhaust Fan and Water Vapour]] | 11:02 AM - January 31, 2025 | | <ul><li>[[3 Resources/Building Elements/Service Cupboards.md\|Service Cupboards]]</li></ul> | [[3 Resources/Issues/Congested Riser Cupboards.md\|Congested Riser Cupboards]] | 10:43 AM - January 31, 2025 | | <ul><li>[[3 Resources/Building Elements/Shaving Cabinets.md\|Shaving Cabinets]]</li></ul> | [[3 Resources/Issues/Desilvered Bathroom Mirrors.md\|Desilvered Bathroom Mirrors]] | 11:01 AM - January 31, 2025 | | <ul><li>[[3 Resources/Building Elements/Air Conditioning.md\|Air Conditioning]]</li></ul> | [[3 Resources/Issues/Pair Coil Insulation Material.md\|Pair Coil Insulation Material]] | 4:33 PM - February 27, 2025 | | <ul><li>[[3 Resources/Building Elements/Hot Water Supply.md\|Hot Water Supply]]</li></ul> | [[3 Resources/Issues/Excessive Dead Legs In Water Supply.md\|Excessive Dead Legs In Water Supply]] | 10:42 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Tiling.md\|Tiling]]</li></ul> | [[3 Resources/Issues/Expansion Joints in Tiled Floors.md\|Expansion Joints in Tiled Floors]] | 10:42 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Fire Hydrant.md\|Fire Hydrant]]</li></ul> | [[3 Resources/Issues/Fire Rated Hydrant Pipe Hangers .md\|Fire Rated Hydrant Pipe Hangers ]] | 10:42 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Sprinkler Pipe.md\|Sprinkler Pipe]]</li><li>[[3 Resources/Building Elements/Sprinkler Heads.md\|Sprinkler Heads]]</li></ul> | [[3 Resources/Issues/Fire Rated Sprinkler Pipe Supports.md\|Fire Rated Sprinkler Pipe Supports]] | 10:42 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Joinery.md\|Joinery]]</li></ul> | [[3 Resources/Issues/Joinery in Wet Areas.md\|Joinery in Wet Areas]] | 10:42 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Service Riser.md\|Service Riser]]</li></ul> | [[3 Resources/Issues/Rooftop Riser Shaft Detailing.md\|Rooftop Riser Shaft Detailing]] | 10:42 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Garden Taps.md\|Garden Taps]]</li></ul> | [[3 Resources/Issues/Provide Backflow Devices to Garden Taps.md\|Provide Backflow Devices to Garden Taps]] | 10:42 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Services.md\|Services]]</li><li>[[3 Resources/Building Elements/Fire Stairs.md\|Fire Stairs]]</li><li>[[3 Resources/Building Elements/Fire Exit.md\|Fire Exit]]</li></ul> | [[3 Resources/Issues/Services in Fire Stairs and Exits.md\|Services in Fire Stairs and Exits]] | 4:50 PM - February 27, 2025 | | <ul><li>[[3 Resources/Building Elements/Awnings.md\|Awnings]]</li></ul> | [[3 Resources/Issues/Access Panels to Awning Soffits are Omitted.md\|Access Panels to Awning Soffits are Omitted]] | 6:21 PM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Fire Doors.md\|Fire Doors]]</li><li>[[3 Resources/Building Elements/Facade.md\|Facade]]</li></ul> | [[3 Resources/Issues/Fire Doors Located in External Areas.md\|Fire Doors Located in External Areas]] | 10:42 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Access Panels.md\|Access Panels]]</li></ul> | [[3 Resources/Issues/Insufficient Access Panels for Mechanical Servicing.md\|Insufficient Access Panels for Mechanical Servicing]] | 10:42 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Awnings.md\|Awnings]]</li><li>[[3 Resources/Building Elements/Metal Roofing.md\|Metal Roofing]]</li></ul> | [[3 Resources/Issues/Kilplock Roofing is difficult to remove.md\|Kilplock Roofing is difficult to remove]] | 10:42 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Access Panels.md\|Access Panels]]</li></ul> | [[3 Resources/Issues/Provide Flanged Access Panels.md\|Provide Flanged Access Panels]] | 10:42 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Timber Flooring.md\|Timber Flooring]]</li></ul> | [[3 Resources/Issues/Timber Flooring Squeaks.md\|Timber Flooring Squeaks]] | 10:49 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Timber Flooring.md\|Timber Flooring]]</li><li>[[3 Resources/Building Elements/Carpet.md\|Carpet]]</li><li>[[3 Resources/Building Elements/Tiling.md\|Tiling]]</li></ul> | [[3 Resources/Issues/Unsightly Ramping between different floor finishes.md\|Unsightly Ramping between different floor finishes]] | 4:22 PM - February 03, 2025 | | <ul><li>[[3 Resources/Building Elements/Windows.md\|Windows]]</li></ul> | [[3 Resources/Issues/Windows Finishing Flush or Close Slab Edges.md\|Windows Finishing Flush or Close Slab Edges]] | 10:50 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/External Walls.md\|External Walls]]</li><li>[[3 Resources/Building Elements/Fire Stairs.md\|Fire Stairs]]</li></ul> | [[3 Resources/Issues/Combustible Products.md\|Combustible Products]] | 10:47 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Masonry Walls.md\|Masonry Walls]]</li><li>[[3 Resources/Building Elements/Facade.md\|Facade]]</li></ul> | [[3 Resources/Issues/Effluorescence from Mortar Mix.md\|Effluorescence from Mortar Mix]] | 10:42 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Cladding.md\|Cladding]]</li><li>[[3 Resources/Building Elements/Insulation.md\|Insulation]]</li></ul> | [[3 Resources/Issues/False Combustibility Certificates.md\|False Combustibility Certificates]] | 10:42 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/External Walls.md\|External Walls]]</li><li>[[3 Resources/Building Elements/Facade.md\|Facade]]</li></ul> | [[3 Resources/Issues/Intumescent Cavity Barriers.md\|Intumescent Cavity Barriers]] | 10:42 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Expansion Joints.md\|Expansion Joints]]</li></ul> | [[3 Resources/Issues/Poor Detailing of Expansion Joints on Facades.md\|Poor Detailing of Expansion Joints on Facades]] | 10:48 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Masonry Walls.md\|Masonry Walls]]</li></ul> | [[3 Resources/Issues/Seal External Facing Masonry and Blockwork Walls.md\|Seal External Facing Masonry and Blockwork Walls]] | 10:42 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Facade.md\|Facade]]</li></ul> | [[3 Resources/Issues/Un-designed Facade Attachments.md\|Un-designed Facade Attachments]] | 10:49 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Facade.md\|Facade]]</li><li>[[3 Resources/Building Elements/Thermal Break.md\|Thermal Break]]</li></ul> | [[3 Resources/Issues/Thermal Breaks Required per NCC2022.md\|Thermal Breaks Required per NCC2022]] | 10:49 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/External Walls.md\|External Walls]]</li></ul> | [[3 Resources/Issues/Mismatched Acrylic Render and Paint.md\|Mismatched Acrylic Render and Paint]] | 10:42 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Roofs.md\|Roofs]]</li><li>[[3 Resources/Building Elements/Anchors.md\|Anchors]]</li><li>[[3 Resources/Building Elements/Windows.md\|Windows]]</li></ul> | [[3 Resources/Issues/Safe Access and Maintenance.md\|Safe Access and Maintenance]] | 10:42 AM - January 24, 2025 | | <ul><li>[[3 Resources/Building Elements/Bidet.md\|Bidet]]</li><li>[[3 Resources/Building Elements/Sales Contracts.md\|Sales Contracts]]</li></ul> | [[3 Resources/Issues/Bidets in Class 2 Buildings.md\|Bidets in Class 2 Buildings]] | 10:46 AM - January 24, 2025 | %% DATAVIEW_PUBLISHER: end %%